Abbiasov, T (2021) Essays in Urban Economics, Unpublished PhD Thesis, , Columbia University.

Asgari, S (2016) Modeling construction competitive bidding: An agent-based approach, Unpublished PhD Thesis, , Columbia University.

Chang, H-H (2002) N-dimensional construction management information system (NDCON): System design and performance modeling through the zero -buffered project management philosophy, Unpublished PhD Thesis, , Columbia University.

Chen, S-M (2002) Intelligent scheduling model and multi-dimensional CM information system, Unpublished PhD Thesis, , Columbia University.

Chiara, N (2006) Real option methods for improving economic risk management in infrastructure project finance, Unpublished PhD Thesis, , Columbia University.

Fitch, G J (2019) System dynamics models for the valuation of real options in infrastructure investments, Unpublished PhD Thesis, , Columbia University.

Gerstenberger, A J (2021) Modeling the likelihood of construction incidents using public data, Unpublished PhD Thesis, , Teachers College, Columbia University.

Gocmen, F C (2014) Infrastructure scaling and pricing, Unpublished PhD Thesis, , Columbia University.

He, Y (2006) Earthquake loss and risk estimation of buildings by Monte Carlo simulation, Unpublished PhD Thesis, , Columbia University.

Hogan, D B (1998) Modeling construction cost performance: A comprehensive approach using statistical, artificial neural network and simulation methods, Unpublished PhD Thesis, , Columbia University.

Kokkaew, N (2010) Risk flexibility analysis in infrastructure project finance, Unpublished PhD Thesis, , Columbia University.

Li, W (1995) Benefit and cost analysis: Three-dimensional computer models with integrated databases in the management of construction, Unpublished PhD Thesis, , Columbia University.

Lu, Z (2018) Feasibility assessment framework for financing public-private partnership infrastructure projects through asset-backed security, Unpublished PhD Thesis, , Columbia University.

Silver, M L (1981) Craft production: Work and alienation in the construction industry, Unpublished PhD Thesis, , Columbia University.

Song, X (2013) The application of insurance as a risk management tool for alternative dispute resolution (ADR) implementation in construction disputes, Unpublished PhD Thesis, , Columbia University.

Sturts, C S (2001) Value-bidding: An integrative approach utilizing conjoint analysis and classical bidding theory, Unpublished PhD Thesis, , Columbia University.

Subsomboon, K (2004) A procurement and material management (PMM) system based on the fully integrated and automated project process (FIAPP), Unpublished PhD Thesis, , Columbia University.

Sun, W (2023) A self-localized smart hardhat system for construction 4.0, Unpublished PhD Thesis, , Columbia University.

Tavakolan, M (2011) Development of construction projects scheduling with evolutionary algorithms, Unpublished PhD Thesis, , Columbia University.

  • Type: Thesis
  • Keywords: duration; fuzzy set; optimization; uncertainty; water resource; construction engineering; inflation; project cost; project planning; scheduling; ant colony optimization; construction project
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/902627829
  • Abstract:
    Evolutionary Algorithms (EAs) as appropriate tools to optimize multi-objective problems have been applied to optimize construction projects in the last two decades. However, studies on improving the convergence ratio and processing time in the most applied algorithms such as Genetic Algorithm (GA), Particle Swarm Optimization (PSO) and Ant Colony Optimization (ACO) in construction engineering and management domains remain poorly understood. Furthermore, hybrid algorithms such as Hybrid Genetic Algorithm-Particle Swarm Optimization (HGAPSO) and Shuffled Frog Leaping Algorithm (SFLA) have been presented in computational optimization and water resource management domains during recent years to prevent pitfalls of the aforementioned algorithms. In this dissertation, I present three studies on hybrid algorithms to show that our proposed hybrid approaches are superior than existing optimization algorithms in finding better project schedule solutions with less total project cost, shorter total project duration, and less total resources allocation moments. In the first, I present a HGAPSO approach to solve complex, TCRO problems in construction project planning. Our proposed approach uses the fuzzy set theory to characterize uncertainty about the input data (i.e., time, cost, and resources required to perform an activity). In the second, I present the SFLA algorithm to solve TCRO problems using splitting allowed during activities execution. The third study involves the evaluation of the inflation impact on resources unit price during execution of construction projects. This research presents the comprehensive TCRO model by comparing two hybrid algorithms, HGAPSO and SFLA, with the three most capable algorithms-GA, PSO and ACO-in six different examples in terms of the structure of projects, construction assumptions and kinds of Time-Cost functions. Each of the three studies helps overcome parts of EAs problems and contributes to obtaining optimal project schedule solutions of total project duration, total project cost and total resources allocation moments of construction projects in the planning stage. The findings have significant implications in improving the scheduling of construction projects.

Teferra, K (2012) Developments in the theory and applications of the variability response function concept, Unpublished PhD Thesis, , Columbia University.

Ucbenli, C (2010) A bargaining mechanism with incomplete information and its application in trilateral BOT negotiations, Unpublished PhD Thesis, , Columbia University.

Unsal, H I (2010) Modeling the hold-up problem and absorptive capacity of project networks, Unpublished PhD Thesis, , Columbia University.

Wang, W (2010) Multivariate stochastic copula-based deterioration models in infrastructure economic risk management, Unpublished PhD Thesis, , Columbia University.